Question:-
If in a process on the shop floor, the specifications are not met, but the charts for variables show control, then which of the following actions should be taken ?
Option (A)
Changes the process
Option (B)
Changes the method of measurement
Option(C)
Changes the worker or provide him training
Option(D)
Change the specifications or upgrade the process
Correct Option:
(C)
question-answer-faq-8936