Question:-
MTM is a work measurement technique by
Option (A)
Stopwatch study
Option (B)
Work sampling study
Option(C)
Predetermined motion time system
Option(D)
Past data comparison
Correct Option:
(C)
Question Solution:
MTM (Method-time measurement) is based on use of standard time for work elements that have been predetermined from long period of observation and analysis.
question-answer-faq-8742