Question:-
100. The pessimistic, most likely and optimistic time for an activity are 5 days, 3 days and 1 day respectively. Assuming Beta distribution, the expected duration of the activity is
Option (A)
3 days
Option (B)
3.5 days
Option(C)
4 days
Option(D)
5 days
Correct Option:
()