Production and Industrial Engineering Question set 2
Production and Industrial Engineering Question set 2
Question:-
Option (A)
0.786
Option (B)
4.345
Option (C)
3.405
Option (D)
0.294
Correct Option:
A
Question Solution:

=

=>

=

therefore,

=

= 0.786
Question:-
Option (A)
0.7 A, 2.3 V
Option (B)
0.2 A, 1.121 V
Option (C)
0.2 A, 0.75 V
Option (D)
0.75 A, 0.2 V
Correct Option:
C
Question Solution:
Put V
D = 0
I
sc=

=> I
sc=0.2 A
PutI
D=0
0=

=>

=

=>

=

=29.017
therefore, V
D=0.0259 x 29.017
=> V
OC=0.75 Volt
Question:-
Option (A)
0.5
Option (B)
0.6
Option (C)
2
Option (D)
- 0.5
Correct Option:
A
Question Solution:
G.F. = 2
1 + 2 υ=G.F.
therefore, υ=

=

= 0.5
Question:-
Option (A)
1.2 N/m2
Option (B)
1.3 N/m2
Option (C)
1.4 N/m2
Option (D)
1.5 N/m2
Correct Option:
B
Question Solution:
S=

20=

ΔP=

P
2 - P
1=0.1
therefore, P
2=0.1 + P
1
=0.1 + 1.2 = 1.3 N/m
2