Question:-
Consider the following steps in production, planning and control:
1. Capacity planning
2. Material requirement planning
3. Purchasing
4. Design decisions
Which one of the following is the correct sequence of the above steps in operations management?
Option (A)
2-3-4-1
Option (B)
2-4-3-1
Option(C)
4-1-2-3
Option(D)
1-2-4-3
Correct Option:
(C)
Question Solution:
Design decision ® Capacity planning ® Material requirement planning ® Purchasing.
question-answer-faq-8911